Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities, Unpublished PhD Thesis, , Illinois Institute of Technology.

Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents, Unpublished PhD Thesis, , Illinois Institute of Technology.

Al-Sobiei, O S (2001) Assessment of risk allocation in construction projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alavipour, S M (2017) Project scheduling using optimized financing, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alkoud, A (2023) Investigating the impact of tall building ordinances (TBOs) on the evolution of ultra-tall buildings typology: Case studies in Chicago and Dubai, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms, Unpublished PhD Thesis, , Illinois Institute of Technology.

Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM, Unpublished PhD Thesis, , Illinois Institute of Technology.

Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids, Unpublished PhD Thesis, , Illinois Institute of Technology.

Gunaydin, H M (1999) Impact of information technologies on project management functions, Unpublished PhD Thesis, , Illinois Institute of Technology.

Gunhan, S M (2003) Foreign market entry decision model for construction companies, Unpublished PhD Thesis, , Illinois Institute of Technology.

Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions, Unpublished PhD Thesis, , Illinois Institute of Technology.

Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kale, S (1999) Competitive advantage in the construction industry: Firm-specific resources and strategy, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kaplanoglu, S B (2007) Impact of pre-project peer review on project success, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kleps, S M (2013) Impact of workflow disruptions, project characteristics and foremen characteristics on improvisational decisions and actions on construction sites, Unpublished PhD Thesis, , Illinois Institute of Technology.

Koksal, A (2002) Predicting the development of decline in construction companies, Unpublished PhD Thesis, , Illinois Institute of Technology.

Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system, Unpublished PhD Thesis, , Illinois Institute of Technology.

Lee, D-E (2004) Construction business automation system (CBAS), Unpublished PhD Thesis, , Illinois Institute of Technology.

Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty, Unpublished PhD Thesis, , Illinois Institute of Technology.

Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings, Unpublished PhD Thesis, , Illinois Institute of Technology.

Mochtar, K (2000) Market-based pricing in construction, Unpublished PhD Thesis, , Illinois Institute of Technology.

Pandey, A R (2016) Heuristic decision-making model for electrical foremen when workflow is disrupted, Unpublished PhD Thesis, , Illinois Institute of Technology.

  • Type: Thesis
  • Keywords: construction site; productivity; heuristic; workflow; interview
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1802057625
  • Abstract:
    The decision-making process used by construction foremen at a job site when the workflow is disrupted was investigated in this study. The foremen’s decision-making process was mapped and then modeled to a heuristic model. This study focuses on cognitive decision or psychological heuristic models. The study shows that construction foremen use a heuristic decision model in their decision-making. The capability of heuristic to yield fast decision is very useful in construction because it is common for a construction foreman to experience several disruptions during the course of a single workday. With heuristic decision-making, a work-around decision can be rapidly and effectively made following a construction site disruption. Understanding the ability of heuristics to facilitate rapid and effective decision-making will help the construction industry to save time and increase productivity. Research was conducted in order to map a decision process that foremen were using in their decision-making and to develop a model for a heuristic decision-making process. Interviews were conducted with 22 construction foremen in the electrical trade in 88 real disruption cases in order to understand how decisions were made after disruptions occurred. Interviews were subsequently conducted with 10 additional industry foremen in 10 real disruption cases to validate the data. Using this data, a heuristic decision-making model was developed. To validate this model, a survey was conducted with another 11 industry foremen. The findings indicate that construction foremen currently use a heuristic decision-making model known as “determinant decision attribute” (referred to as DDA) heuristics model. This DDA heuristic model was compared to the similar model with equal weighing and elimination by aspects (referred to as EW/EBA) to assess the performance of the heuristic. The DDA heuristic model correctly predicted, on average, 91% of the time what foremen’s decisions were as to which decision task to choose to assign or re-assign to crew members. Whereas, the EW/EBA model correctly predicted, on average, 82% of the time, the foremen’s decisions. A computer program was also developed for DDA heuristic model to help foremen expedite the process of their decision-making.

Pulket, T (2008) Universal prediction model for construction litigation, Unpublished PhD Thesis, , Illinois Institute of Technology.

Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory, Unpublished PhD Thesis, , Illinois Institute of Technology.

Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration, Unpublished PhD Thesis, , Illinois Institute of Technology.

Rujirayanyong, T (2004) Data warehousing for construction, Unpublished PhD Thesis, , Illinois Institute of Technology.

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures, Unpublished PhD Thesis, , Illinois Institute of Technology.

Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology, Unpublished PhD Thesis, , Illinois Institute of Technology.

Tokdemir, O B (2003) ALISS: Advanced linear scheduling system, Unpublished PhD Thesis, , Illinois Institute of Technology.

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhang, C (2013) Automated progress control using laser scanning technology, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhou, Q (2002) From CAD to IAD: An internet application of steel construction consulting for architects, Unpublished PhD Thesis, , Illinois Institute of Technology.